Project Record

218 Contracts Delivered — and Counting

Almost every contract in our record was performed for the 39th Air Base Wing at Incirlik Air Base, with one fuel systems project for ITSI Gilbane.

Representative Contracts

Selected Work, 2003 – 2021

Filter by category or search the representative contracts below — a selection from a 218-line project record spanning 2003–2021.

Fiber Optics

Fiber Optic Cabling System for Buildings #952 & #954

39th Air Base Wing2003
Fiber Optics

Communication Support Cable Maintenance — Fiber Optic Distribution System

39th Air Base Wing2004
Communications Infrastructure

CNS Communication Duct Banks & Cable Installation, Munitions Area

39th Air Base Wing2007
Fuel Systems

Fuel Lines Improvement

ITSI Gilbane2013
Demolition

Demolition of Old Finance Facility #480 & Old Open Mess Facility #884

39th Air Base Wing2020
Construction

Construction of Prefabricated Gym, PV Dorms

39th Air Base Wing2020
Airfield Works

Repair Runway Striping

39th Air Base Wing2021
Construction

Install Awning, Post Office Building 977

39th Air Base Wing2021
Water Infrastructure

Connect Base Waterline Distribution System to Adana City Line

39th Air Base Wing—
Environmental Services

Maintain Oil/Water Separator, Base-Wide

39th Air Base Wing—
Painting & Finishing

Paint Various Facilities 244, 350 & 1080

39th Air Base Wing—

Note: Selected representative contracts from a 218-line project record (2003–2021).

Scope Coverage

Categories Across the Record

Beyond the representative contracts above, the full record covers the following categories of work.

Fiber & copper cablingGenerators & MV/HV cablingHVACRoofingFencingAirfield lighting & taxiway worksWater & sewerPainting & flooringDesign services